I 135 1924 ı....|....ı....|....ı....|....ı....|....ı....|....ı....|....ı....|....ı....|....ı....|....ı....|..2023 2024 Our TechCenter, which has an area of 700 square metres on two floors, was built with an investment of more than 3.5 million euros. It houses test benches and test facilities that are specially tailored to the needs of the pharmaceutical and biotech industry. Among other things, a test stand enables practical testing of valves for sterile process engineering, allowing our development team to simulate cleaning and sterilisation processes under original conditions. Our sustainability policy is also reflected in the climate-neutral design of the building, which requires neither heating nor cooling. Our TechCenter thus sets standards in the development and testing of diaphragm valves and underlines our claim to continue supplying innovative products of the highest quality in the future.